I clecoed the side plates to the center section today and then added the forward F704 bulkhead. I then match drilled the bottom skin to the bulkheads and to the seat and baggage ribs. The instructions and plans specified that 4 holes on the forward F704 bulkhead needed to be countersunk through the bottom skin and into the bulkhead in order to have the floor stiffeners fit better later.
Side plates clecoed and match drilled
4 holes countersunk for smooth fit of floor stiffeners