KitLog pro

Powered By Kitlog Pro v2.0

Dan's Web Site
' style=
Date:  3-20-2005
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Install Floor Nutplates; Ream Clevis's

Once the center support block was drilled to the floor, I removed the actuator arm and used my nutplate jig to drill the rivet holes in the flange of the tunnel rib and floor panel. The holes were then deburred and dimpled and nutplates installed. The next thing that I did was ream each of the actuator arm clevis's to 1/4". I decided to bolt the rod end bearings on the workbench rather than trying to do this once the arm was installed in the fuselage. Much easier this way.
' style=

Nutplates installed for center support block

Nutplates installed for center support block

' style=

Flap actuator arm clevis's reamed to 1/4

Flap actuator arm clevis's reamed to 1/4" and rod ends installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.