KitLog pro

Powered By Kitlog Pro v2.0

Marlins Web Site
' style=
Date:  2-21-2024
Number of Hours:  6.00
Manual Reference:  N/A
Brief Description:  Fabricate Fairings for the Aft Rudder Cables (Cont

After curing the fiberglass rudder fairings, I added a 1-inch-deep layer of epoxy flox to the upper-inside of the fairing to give it some strength and allowed this to cure for two days. After curing, I sanded the hardened flox, especially at the aft ends because once these are installed, you will be able to see part of the inside of the fairings and these will need to be primed and painted. Then, I carefully cut the angled shape at the back of the fairing to accommodate the right and left rudder-swing to the stops.
' style=

Flox added for Strength

Flox added for Strength

' style=

2nd Fairing with Flox Added

2nd Fairing with Flox Added

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.