Work Logs Found: 35
Category Work Time: 241 Hours
 Date
Hours
Work Log Summary

Details

 02-10-2023
3.00
Install Engine Filter Bypass/Alternate Air Cable
Details
       

 02-09-2023
4.00
Install Oil Cooler
Details
       

 02-06-2023
16.00
Install Engine EGT & CHT Sensors (Cont.)
Details
       

 02-01-2023
3.00
Install Engine EGT & CHT Sensors (Cont.)
Details
       

 01-30-2023
18.00
Install Engine EGT & CHT Sensors
Details
       

 01-27-2023
6.00
Install Cabin Heat Muff and Tubing (Cont.)
Details
       

 01-26-2023
6.00
Install Cabin Heat Muff and Tubing
Details
       

 01-25-2023
6.00
Install Air/Water Separator Drain Hoses & Fuel Pum
Details
       

 12-01-2022
6.00
Installing the VA-132 Air Injection Snorkel (Cont.
Details
       

 11-30-2022
3.00
Installing the VA-132 Air Injection Snorkel (Cont.
Details
       

 11-28-2022
3.00
Installing the VA-132 Air Injection Snorkel
Details
       

 04-22-2022
4.00
Installing the Vetterman Crossover Exhaust (Cont.)
Details
       

 04-21-2022
5.00
Installing the Vetterman Crossover Exhaust
Details
       

 04-21-2022
5.00
Fabricating a Throttle Control Mounting Bracket
Details
       

 04-20-2022
3.00
Remove Throttle Control Assembly
Details
       

 11-05-2021
5.00
Installed New Electrical Boots & Engine Ground
Details
       

 10-15-2021
12.00
Fuel Pump Cooling Shroud/Fuel Flow Sensor Install
Details
       

 10-05-2021
9.00
Install Fuel Injection Servo, & Mixture Linkages
Details
       

 09-30-2021
8.00
FabricateThrottle and Mixture Brackets
Details
       

 09-20-2021
7.00
Mounting the Engine
Details
       

 09-15-2021
8.00
Preparation for Hanging the Engine
Details
       

 07-10-2020
2.00
Installed Desiccant Plugs
Details
       

 06-15-2020
26.00
Reconditioned & Painted Intake and Starter
Details
       

 05-20-2020
5.00
Time to uncrate the Engine
Details
       

 12-06-2018
8.00
Manifold Pressure Fitting & Prep Aft Fuselage Skin
Details
       

 12-05-2018
4.00
Firewall Forward Prior to Closing Front Deck (cont
Details
       

 12-04-2018
6.00
Firewall Forward Prior to Closing Front Deck
Details
       

 11-30-2018
8.00
Install Filtered Air Bypass Control Cable
Details
       

 11-29-2018
8.00
Install Engine Control Cables Continued
Details
       

 11-28-2018
8.00
Install Engine Controls
Details
       

 11-27-2018
12.00
Installed Cabin Heat Inlet Valve and Control
Details
       

 03-30-2018
5.00
Installed ACS Ignition Switch Wiring
Details
       

 12-09-2017
4.00
Removed oil and fuel pressure sending units from c
Details
       

 07-26-2017
4.00
Installed the Engine/Nosewheel Landing Gear Mount
Details
       

 08-10-2008
1.00
Recieived XIO-360-M1B Lycoming 180 hp Engine
Details
       