KitLog pro

Powered By Kitlog Pro v2.0

Marlins Web Site
Work Logs Found: 671
Category Work Time: 5680 Hours
 Date
Hours
Work Log Summary

Details

 04-10-2024
8.00
Brake Springs & Rudder Extenders
Details
       

 04-05-2024
10.00
Final Prime Coat for Rudder Cable Fairings
Details
       

 04-03-2024
10.00
Complete Fairings for the Aft Rudder Cables (Cont.
Details
       

 03-25-2024
22.00
Vertical Stabilizer & Rudder Horn Fiberglass
Details
       

 03-05-2024
4.00
Replace Brake Caliper Seals
Details
       

 03-01-2024
10.00
Main Gear Shimmy Struts
Details
       

 02-26-2024
8.00
Fabricate Fairings for the Aft Rudder Cables (Cont
Details
       

 02-21-2024
6.00
Fabricate Fairings for the Aft Rudder Cables (Cont
Details
       

 02-20-2024
10.00
Fabricate Fairings for the Aft Rudder Cables (Cont
Details
       

 02-17-2024
8.00
Fabricate Fairings for the Aft Rudder Cables (Cont
Details
       

 02-16-2024
3.00
Fabricate Fairings for the Aft Rudder Cables
Details
       

 02-15-2024
10.00
Preparing Spinner Hub for Priming
Details
     

 02-05-2024
1.00
Installing Platenuts on Aft Spinner Hub Plate (con
Details
       

 01-24-2024
8.00
Installing Platenuts on Aft Spinner Hub Plate
Details
       

 01-18-2024
8.00
Fabricating Spinner Cut-Out Hole Gap Filler (Cont.
Details
       

 01-17-2024
8.00
Fabricating Spinner Cut-Out Hole Gap Filler
Details
       

 01-12-2024
4.00
Installing the Fiberglass Spinner (Cont.)
Details
       

 01-11-2024
8.00
Installing the Fiberglass Spinner (Cont.)
Details
       

 01-10-2024
8.00
Installing the Fiberglass Spinner
Details
       

 01-09-2024
5.00
Install the Front Spinner Hub Plate
Details
       

 01-08-2024
5.00
Safety Wiring the Propeller Hub Bolts
Details
       

 01-06-2024
10.00
Adjusting Aft Spinner Plate
Details
       

 01-05-2024
6.00
Installing the Propeller!
Details
       

 01-04-2024
1.00
Mounting the Prop Hub & Spinner Assembly
Details
       

 01-03-2024
10.00
Constant Speed Propeller Bulkhead Assembly
Details
       

 12-15-2023
15.00
Main Gear Wheel Pants Tinnerman Washers & Fibergla
Details
       

 12-11-2023
15.00
Main Wheel Tire Air Access Doors
Details
       

 12-05-2023
25.00
Main Gear Wheel Pants Fiberglass Work
Details
       

 11-28-2023
15.00
More Epoxy/Curing/Sanding/Saying Bad Things
Details
       

 11-27-2023
35.00
Finish Epoxy Coats on Nose Fairings/ Wheel Pants
Details
       

 11-04-2023
15.00
Upper/Aft Nose Gear Wheel Pant
Details
       

 11-02-2023
10.00
Nose Wheel Tire Air Door (cont.)
Details
       

 10-31-2023
10.00
Nose Wheel Tire Air Door (cont.)
Details
       

 10-29-2023
3.00
Nose Wheel Tire Air Door
Details
       

 10-27-2023
15.00
Realign Anti-Splat Nose Job Brace & Fairings
Details
       

 10-25-2023
20.00
Multiple Layer Epoxy Process Nose Gear Fairing
Details
       

 10-17-2023
20.00
Shelling the Upper and Lower Cowl (Cont.
Details
       

 10-02-2023
15.00
Shelling the Lower Cowl
Details
       

 09-18-2023
23.00
Glazing Applied to Lower Cowl (Cont.)
Details
       

 09-11-2023
10.00
Glazing Applied to Lower Cowl
Details
       

 09-05-2023
2.00
Lower Cowl Heat Shield Installation (Cont.)
Details
       

 08-23-2023
18.00
Lower Cowl Heat Shield Installation
Details
       

 08-18-2023
6.00
Repainted Cowl Interiors
Details
       

 08-15-2023
8.00
Primed and Painted Cowl Interiors
Details
       

 08-11-2023
4.00
Bottom Cowl Aft Support Brackets Installation
Details
       

 08-10-2023
6.00
Lower Cowl Forward Filler Bracket
Details
       

 08-07-2023
12.00
Bottom Cowl Aft Support Brackets
Details
       

 07-28-2023
9.00
Nose Gear Fairing Over the Gear Stiffener (Cont.)
Details

 07-27-2023
12.00
Nose Gear Fairing Over the Gear Stiffener
Details
       

 07-25-2023
8.00
Nose-Gear Nose-Job
Details
       

 07-18-2023
10.00
Repairing Cowl Discrepancies
Details
       

 07-12-2023
8.00
Decorative RV-7A Cowling Hinge Pin Covers
Details
       

 07-10-2023
8.00
Decorative RV-7A Cowling Hinge Pin Covers
Details
       

 06-26-2023
14.00
Empennage Fairing Fiberglass Rebuild (Cont.)
Details
       

 06-20-2023
12.00
Empennage Fairing Fiberglass Rebuild (Cont.)
Details
       

 06-13-2023
6.00
Install Oil Access Door (Cont.)
Details
       

 06-10-2023
10.00
Install Oil Access Door (Cont.)
Details
       

 06-05-2023
12.00
Empennage Fairing Fiberglass Rebuild (Cont.)
Details
       

 06-01-2023
10.00
Empennage Fairing Fiberglass Rebuild (Cont.)
Details
       

 05-25-2023
55.00
Empennage Fairing Fiberglass Rebuild
Details
       

 05-23-2023
4.00
Re-Installing Rubber Baffle Seals on Lower Cowl
Details
       

 05-22-2023
8.00
Install Oil Access Door (Cont.)
Details
       

 05-19-2023
4.00
Install Oil Access Door (Cont.)
Details
     

 05-18-2023
6.00
Install Oil Access Door (Cont.)
Details
       

 05-16-2023
6.00
Install Oil Access Door (Cont.)
Details
       

 05-10-2023
12.00
Install Oil Access Door
Details
       

 05-08-2023
10.00
Repairing Cowl Discrepancies
Details
       

 05-05-2023
6.00
Finished Installing Cowl Louvers (Cont.)
Details
       

 05-04-2023
6.00
Finished Installing Cowl Louvers
Details
       

 04-28-2023
3.00
Install Cowl Louvers (Cont.)
Details
       

 04-26-2023
12.00
Install Cowl Louvers (Cont.)
Details
       

 04-21-2023
4.00
Install Cowl Louvers (Cont.)
Details
       

 04-20-2023
4.00
Install Cowl Louvers
Details
       

 04-18-2023
6.00
Modify Front Baffles and Install Rubber Seals
Details
       

 04-14-2023
6.00
Install & Seal Baffles, Glass in Ramps
Details
       

 04-07-2023
6.00
Fiberglass Inlet Ramps (Cont.)
Details
       

 04-05-2023
6.00
Fiberglass Inlet Ramps
Details
       

 04-04-2023
6.00
Fabricate Inlet Ramps
Details
       

 03-30-2023
25.00
Empennage Fairing Fiberglass Work
Details
       

 03-28-2023
17.00
Rivet Rubber Baffle Seals
Details
       

 03-27-2023
5.00
Cut Rubber Baffle Seals
Details
       

 02-23-2023
8.00
Fabricate the Rubber Baffle Seals
Details
       

 02-22-2023
6.00
Fabricate/Trim the Front Engine Baffles (Cont.)
Details
       

 02-15-2023
20.00
Fabricate/Trim the Front Engine Baffles
Details
       

 02-14-2023
8.00
Create Inlet Outer Curved Flanges (Cont.)
Details
       

 02-13-2023
6.00
Create Inlet Outer Curved Flanges
Details
       

 02-10-2023
3.00
Install Engine Filter Bypass/Alternate Air Cable
Details
       

 02-09-2023
4.00
Install Oil Cooler
Details
       

 02-06-2023
16.00
Install Engine EGT & CHT Sensors (Cont.)
Details
       

 02-01-2023
3.00
Install Engine EGT & CHT Sensors (Cont.)
Details
       

 01-30-2023
18.00
Install Engine EGT & CHT Sensors
Details
       

 01-27-2023
6.00
Install Cabin Heat Muff and Tubing (Cont.)
Details
       

 01-26-2023
6.00
Install Cabin Heat Muff and Tubing
Details
       

 01-25-2023
6.00
Install Air/Water Separator Drain Hoses & Fuel Pum
Details
       

 01-13-2023
6.00
Drill and Install Magneto & Fuel Pump Blast Tubes
Details
       

 01-13-2023
1.00
Drill and Install Magneto & Fuel Pump Blast Tubes
Details
       

 01-12-2023
6.00
Installed Right Inlet Floor Heater Flange & Heat M
Details
       

 01-11-2023
6.00
Installed Right Inlet Floor Heater Flange & Heat M
Details
       

 01-10-2023
3.00
Adding Spark Plug Wire Mounts and Ties
Details
       

 01-09-2023
1.00
Cut Cowl Intake for New Filter
Details
       

 01-06-2023
5.00
Fixing Cabin Heat Flange
Details
       

 01-05-2023
3.00
Final Snorkel Installation/Mounting
Details
       

 01-04-2023
6.00
Fabricating and Installing Baffle Tension Rods (Co
Details
       

 01-03-2023
12.00
Fabricating and Installing Baffle Tension Rods
Details
       

 01-02-2023
4.00
Painted Baffle Parts
Details
       

 12-21-2022
10.00
Installing the Filter Bypass Door (Cont.)
Details
       

 12-19-2022
12.00
I0-360 Filter Bypass Door Installation
Details
       

 12-16-2022
10.00
Fiberglass Snorkel
Details
       

 12-12-2022
18.00
Continued Snorkel Install; Begin Air Ramp Mods
Details
       

 12-08-2022
13.00
Continued Snorkel Install; Begin Air Ramp Mods
Details
       

 12-06-2022
6.00
Continued Snorkel Install; Begin Air Ramp Mod
Details
       

 12-05-2022
1.00
Continued Snorkel Install; Begin Air Ramp Mods
Details
       

 12-01-2022
6.00
Installing the VA-132 Air Injection Snorkel (Cont.
Details
       

 11-30-2022
3.00
Installing the VA-132 Air Injection Snorkel (Cont.
Details
       

 11-28-2022
3.00
Installing the VA-132 Air Injection Snorkel
Details
       

 11-22-2022
1.00
Brackets for Front-Center Baffles (Cont.)
Details
       

 11-21-2022
1.00
Brackets for Front-Center Baffles
Details
       

 11-18-2022
5.00
Cut, Fit, Bend the Front-Center Baffles (Cont.)
Details
       

 11-17-2022
10.00
Cut, Fit, Bend the Front-Center Baffles
Details
       

 11-15-2022
1.00
Move Airplane and Reorganize within Hangar
Details
       

 11-07-2022
5.00
Marking and Cutting Side Baffles
Details
       

 11-05-2022
3.00
Left Forward Ramp Support
Details
       

 11-04-2022
4.00
Fitting the Front Baffles to the Cowl Inlets (Cont
Details
       

 11-03-2022
5.00
Fitting the Front Baffles to the Cowl Inlets
Details
       

 11-02-2022
4.00
Cutting & bending side baffle flanges
Details
       

 10-28-2022
4.00
Cut Outboard Baffle and Floor-Baffle Flanges (cont
Details
       

 10-27-2022
5.00
Cut Outboard Baffle and Floor-Baffle Flanges
Details
       

 10-25-2022
6.00
Cut Outboard Baffle and Floor-Baffle Flanges
Details
       

 10-18-2022
12.00
Install Baffling (cont.)
Details
       

 10-03-2022
9.00
Install Baffling (cont.)
Details
       

 09-30-2022
6.00
Install Baffling (cont.)
Details
       

 09-27-2022
18.00
Install Baffling (cont.)
Details
       

 09-22-2022
7.00
Install Baffling (cont.)
Details
       

 09-20-2022
6.00
Install Baffling (cont.)
Details
       

 09-19-2022
4.00
Install Baffling (cont.)
Details
       

 09-17-2022
6.00
Install Baffling (cont.)
Details
       

 09-15-2022
1.00
Install Baffling (cont.) Oil Cooler Brace
Details
       

 09-14-2022
6.00
Install Baffling (cont.)
Details
       

 09-13-2022
6.00
Install Baffling (cont.)
Details
       

 09-12-2022
6.00
Install Baffling
Details
       

 04-22-2022
4.00
Installing the Vetterman Crossover Exhaust (Cont.)
Details
       

 04-21-2022
5.00
Installing the Vetterman Crossover Exhaust
Details
       

 04-21-2022
5.00
Fabricating a Throttle Control Mounting Bracket
Details
       

 04-20-2022
3.00
Remove Throttle Control Assembly
Details
       

 04-19-2022
11.00
Adjusting the Skybolts
Details
       

 04-12-2022
7.00
Installing the Cowling Piano Hinges (Cont.)
Details
       

 04-11-2022
5.00
Installing the Cowling Piano Hinges (Cont.)
Details
       

 04-08-2022
16.00
Installing the Cowling Piano Hinges (Cont.)
Details
       

 04-04-2022
6.00
Installing the Cowling Piano Hinges
Details
       

 03-30-2022
4.00
Received New I0-360M1B Vetterman Crossover Exhaust
Details
       

 03-21-2022
15.00
Still Not Done with SkyBolt Installation
Details
       

 03-16-2022
25.00
Drill Cowlings and Rivet Adjustable SkyBolt Recept
Details
       

 03-15-2022
5.00
Process of Fitting Upper & Lower Cowlings (Cont.)
Details
       

 03-14-2022
6.00
Process of Fitting Upper & Lower Cowlings (Cont.)
Details
       

 03-12-2022
8.00
Process of Fitting Upper & Lower Cowlings (Cont.)
Details
       

 03-11-2022
8.00
Process of Fitting Upper & Lower Cowlings
Details
       

 03-10-2022
5.00
Cut/Fit Lower Cowling
Details
       

 03-09-2022
6.00
SkyBolt Quarter-Turn Fasteners
Details
       

 03-08-2022
1.00
Cutting the Upper Cowl (cont.)
Details
       

 03-07-2022
6.00
Began Cuts on Upper Cowl
Details
       

 03-05-2022
4.00
Cut/Fit the Engine Cowling (cont.)
Details
       

 03-04-2022
4.00
Cut/Fit the Engine Cowling (cont.)
Details
       

 03-03-2022
6.00
Cut/Fit the Engine Cowling
Details
       

 02-22-2022
25.00
Attempted to install Vetterman Crossover Exhaust
Details
       

 02-15-2022
15.00
Rearranged wires and hoses on firewall
Details
       

 11-05-2021
5.00
Installed New Electrical Boots & Engine Ground
Details
       

 11-01-2021
18.00
Install Constant Speed Propeller Governor (Cont.)
Details
       

 10-25-2021
20.00
Install Constant Speed Propeller Governor
Details
       

 10-15-2021
12.00
Fuel Pump Cooling Shroud/Fuel Flow Sensor Install
Details
       

 10-05-2021
9.00
Install Fuel Injection Servo, & Mixture Linkages
Details
       

 09-30-2021
8.00
FabricateThrottle and Mixture Brackets
Details
       

 09-20-2021
7.00
Mounting the Engine
Details
       

 09-15-2021
8.00
Preparation for Hanging the Engine
Details
       

 09-03-2021
12.00
Install the Fire Shield on the Firewall
Details
       

 08-30-2021
5.00
Seal the firewall with RTV
Details
       

 08-26-2021
9.00
Install Skybolt Z-Loc Cowling Fasteners
Details
       

 08-21-2021
9.00
Cowling 2” Scribe Line Offset and Z-Lok Fasteners
Details
       

 08-17-2021
8.00
Cutting the Firewall Fire-Shield
Details
       

 08-13-2021
10.00
Making Template for Firewall Fire-Shield (Cont.)
Details
       

 08-11-2021
10.00
Making Template for Firewall Fire-Shield
Details
       

 07-30-2021
7.00
Removing Firewall Piano Hinges to Install Sky Bolt
Details
       

 07-29-2021
8.00
Windscreen Final Fiberglass Filler and Sealing (Co
Details
       

 06-28-2021
38.00
Windscreen Final Fiberglass Filler and Sealing
Details
       

 05-10-2021
20.00
Windscreen Fiberglass Work
Details
       

 04-20-2021
1.00
More Initial Windscreen Layup
Details
       

 04-19-2021
13.00
Making Cardboard Templates, Cutting Cloth, Laying
Details
       

 04-16-2021
3.00
Windscreen – More Templates
Details
       

 04-15-2021
7.00
Creating & Cutting out the templates
Details
       

 04-14-2021
9.00
Windscreen – Filling in the Void
Details
       

 04-13-2021
3.00
Windscreen Hold Down Clips - Filling the Void
Details
       

 04-12-2021
5.00
Fiberglassing the Windscreen
Details
       

 04-10-2021
8.00
More Wheel Fairing Work
Details
       

 04-09-2021
15.00
Fiberglass Wheel Pants
Details
       

 03-15-2021
35.00
Fiberglass vertical stabilizer and rudder
Details
       

 12-15-2020
8.00
Fiberglass Empennage Tip Fairings
Details
       

 12-05-2020
20.00
Fiberglass Empennage Tip Fairings
Details
       

 11-24-2020
22.00
Sanding/Fitting Wheel Pants
Details
       

 11-13-2020
8.00
Setting up the hangar
Details
       

 11-05-2020
5.00
Its Moving Day (cont.)
Details
       

 11-04-2020
8.00
Its Moving Day
Details
       

 11-02-2020
1.00
Nosewheel Stop Backwards
Details
       

 10-22-2020
10.00
Installing the Nose Gear Fairing
Details
       

 10-20-2020
6.00
Installing the Nose Gear Wheel Pant (cont.)
Details
       

 10-19-2020
10.00
Installing the Nose Gear Wheel Pant (cont.)
Details
       

 10-17-2020
9.00
Installing the Nose Gear Wheel Pant
Details
       

 10-16-2020
18.00
Installing the Main Gear Wheel Pants (cont.)
Details
       

 10-15-2020
15.00
Fitting Wheel Pants Around Gear Leg and Wheels
Details
       

 10-13-2020
2.00
Installing the Wheel Pants & U-808 Support Bracket
Details
       

 10-13-2020
6.00
Fabricating/Mating Wheel Pant Halves
Details
       

 10-10-2020
6.00
Bled Brakes/ Fixed Gradual Tire Air Leak
Details
       

 10-06-2020
2.00
More Landing Gear Alignment Pictures
Details
       

 10-01-2020
28.00
Align gear fairings with in-flight airflow
Details
       

 09-10-2020
3.00
Main Landing Gear Fairings (cont.)
Details
       

 09-10-2020
10.00
Main Gear Leg Fairing Installation (cont.)
Details
       

 08-28-2020
8.00
Main Gear Leg Fairing Installation
Details
       

 08-05-2020
2.00
Installed Canopy Lock
Details
       

 07-29-2020
4.00
Clear-Coat Epoxied the Garmin GPS Antenna
Details
       

 07-28-2020
9.00
New battery, Redesigned Hold-Down, Moved Alt-Air
Details
       

 07-24-2020
0.00
More SkyBolt VLoc Fastner Syste
Details
       

 07-23-2020
0.00
More Skybolt VLoc
Details
       

 07-22-2020
0.00
Pictures of SkyBolt VLOC System
Details
       

 07-21-2020
9.00
Fitting the Cowl; Installing the Hinges
Details
       

 07-14-2020
5.00
Install New Panel LED Lights
Details
       

 07-10-2020
2.00
Installed Desiccant Plugs
Details
       

 06-15-2020
26.00
Reconditioned & Painted Intake and Starter
Details
       

 05-20-2020
5.00
Time to uncrate the Engine
Details
       

 05-08-2020
2.00
Finished Moving -7A to install Engine
Details
       

 05-07-2020
7.00
Rearranged Garages & Moved Airplane
Details
       

 05-06-2020
5.00
Attach the Windshield to the Roll Bar
Details
       

 04-30-2020
25.00
Aft Canopy Skirts (Cont.)
Details
       

 04-28-2020
45.00
Aft Canopy Skirts (Cont.)
Details
       

 04-14-2020
15.00
Aft Canopy Skirts (Cont.)
Details
       

 04-13-2020
10.00
Started C-666 Aft Canopy Skirts
Details
       

 03-04-2020
4.00
Final Canopy Side Skirt Installation (Cont.)
Details
       

 03-03-2020
10.00
Final Canopy Side Skirt Installation
Details
       

 03-02-2020
9.00
Riveted Canopy Plexiglass to Slider Frame
Details
     

 02-29-2020
6.00
Final Canopy Latch Installation
Details
       

 02-27-2020
6.00
Kroger RV Super-Slider Sunshade Installation
Details
       

 12-02-2019
0.00
Completed 60’ x 80’ Hangar
Details
       

 11-01-2019
40.00
Disassembled Canopy and Painted
Details
       

 10-09-2019
3.00
C-791 Installation Continued
Details
       

 10-08-2019
6.00
Fabricating/Drilling C-791 Lower Canopy Skirt Brac
Details
       

 10-07-2019
6.00
Drilling Lower edge of Canopy Plexiglass
Details
     

 10-03-2019
8.50
Align & Drill Skirt Bracing with Skirt and Canopy
Details
       

 10-02-2019
6.00
Fitting the Canopy Side Skirts
Details
       

 10-01-2019
0.00
Insulation,Siding, & Roof Being Installed
Details
       

 09-18-2019
0.00
Bifold Door Being Rigged
       

 07-30-2019
0.00
Doors arrive as framework goes up
Details
       

 07-03-2019
0.00
Hanger Floor Poured
Details
       

 06-29-2019
1.00
Fitted the Rear Anchor Blocks (cont.)
Details
       

 06-28-2019
7.00
Fitted the Rear Anchor Blocks
Details
       

 06-26-2019
0.00
Began Construction on Hanger
Details
       

 04-20-2019
5.50
Fitting the Canopy Latch (continued)
Details
       

 04-19-2019
3.00
Fitting the Canopy Latch
Details
       

 04-15-2019
24.00
Fitting the Plexiglass Windscreen
Details
       

 04-04-2019
6.00
Countersinking Plexiglass & Fabricating Hole Finde
Details
       

 04-03-2019
9.00
Fitting the Sliding Frame to the Canopy Bubble
Details
       

 03-28-2019
8.00
Drilling the Plexiglass to the Canopy Frame
Details
       

 03-27-2019
15.00
Separating the Plexiglass Canopy
Details
       

 03-23-2019
5.00
Drilled Canopy Latch Hole and Made 2nd Cuts
Details
       

 03-21-2019
8.50
Cut excess material off the Lexicon/Plexiglass Can
Details
       

 03-16-2019
3.00
Marking the Canopy Centerline
Details
       

 03-14-2019
9.00
Re-adjusted the Canopy Frame…again.
Details
       

 02-27-2019
17.00
More Cosmetic Body-Work
Details
       

 02-26-2019
3.00
Polyester-Epoxy Filler for Rivet Imperfections
Details
       

 02-14-2019
12.00
Riveted Forward Avionics Deck
Details
       

 01-28-2019
10.00
Riveted Turtle Deck (Upper Aft Skin)
Details
       

 01-25-2019
6.00
Upper Aft Skin (Turtle Deck) Prep
Details
       

 01-22-2019
8.00
Canopy Frame Adjustments (cont.)
Details
       

 01-17-2019
5.00
More Canopy Frame Adjustments
Details
       

 01-14-2019
7.00
Canopy Frame (WD-640) Adjustments
Details
       

 01-10-2019
8.00
Fabricating the Aft Slider Rail Assembly
Details
       

 12-15-2018
6.00
Sliding Canopy Frame Tracks & Rear Guide
Details
       

 12-13-2018
6.00
Assembling the Sliding Canopy Frame Rollers
Details
       

 12-11-2018
9.00
Prep Forward Upper Skin and Install Roll Bar Cente
Details
       

 12-10-2018
11.00
Began building the Windscreen/Roll Bar Assembly
Details
       

 12-08-2018
6.00
Attach Roll Bar and Center Attach Brace cont.
Details
       

 12-07-2018
4.00
Upper Aft Fuselage Skin
Details
       

 12-06-2018
8.00
Manifold Pressure Fitting & Prep Aft Fuselage Skin
Details
       

 12-05-2018
4.00
Firewall Forward Prior to Closing Front Deck (cont
Details
       

 12-04-2018
6.00
Firewall Forward Prior to Closing Front Deck
Details
       

 12-03-2018
3.00
Modify Cockpit Access Panel Firewall Bulkhead
Details
     

 11-30-2018
8.00
Install Filtered Air Bypass Control Cable
Details
       

 11-29-2018
8.00
Install Engine Control Cables Continued
Details
       

 11-28-2018
8.00
Install Engine Controls
Details
       

 11-27-2018
12.00
Installed Cabin Heat Inlet Valve and Control
Details
       

 11-26-2018
6.00
Fuel Pump & Cabin Heat Covers
Details
       

 11-21-2018
4.00
Install Baggage & CTR Console Panels
Details
       

 11-20-2018
3.00
Began to go through all previous building plans
Details
       

 11-19-2018
6.00
Install Fiberglass Tip on Vertical Stabilizer
Details
       

 11-17-2018
5.00
Fiberglass tips continued
Details
       

 11-16-2018
5.00
Install Fiberglass Horizontal Stab & Elevator Tips
Details
       

 11-15-2018
9.00
Empennage Fairing Attachment (cont.)
Details
       

 11-13-2018
7.00
Empennage Fairing Attachment (cont.)
Details
       

 11-12-2018
5.00
Empennage Fairing Attachment (cont.)
Details
       

 11-10-2018
13.00
Empennage Fairing Attachment
Details
       

 11-07-2018
2.00
Tied Wire Bundles (Continued)
Details
       

 11-07-2018
2.00
Tied Wire Bundles (Continued)
Details
       

 11-06-2018
2.00
Tied Wire Bundles (Continued)
Details
       

 11-05-2018
5.00
Tied all electrical wires into bundles
Details
       

 11-04-2018
2.00
Created Fuse Ref for POH
Details
       

 11-04-2018
75.00
Create Ops & Continued Airworthiness Manuals
Details
       

 08-29-2018
1.50
Adjusted Elevator Trim to Center Pitch-Trim Indica
Details
       

 08-28-2018
2.50
Adjusted Elevator Push-Pull Rod
Details
       

 08-27-2018
75.00
Completed Avionics Configuration (except GNS 430W)
Details
       

 05-05-2018
6.00
Found Electrical Fault in Aileron Trim Servo
Details
       

 04-16-2018
6.00
Configuring Avionics—Problem with Transponder
Details
       

 04-14-2018
3.00
GRT Warning Lite and More Labels
Details
       

 04-13-2018
7.00
Permanently Installed cockpit panel labels
Details
       

 04-13-2018
1.00
Permanently Installed cockpit panel labels
Details
       

 04-13-2018
1.00
Permanently Installed cockpit panel labels
Details
       

 04-12-2018
11.00
Installed WxWORX XM/WX Receiver wiring
Details
       

 04-10-2018
7.00
Installed Alternator Warning Light and Alternator
Details
       

 04-09-2018
6.00
Drilled Access Holes in FWD TOP Skin
Details
       

 04-08-2018
5.00
Installed UNISON Slick LASAR Low Voltage Control H
Details
       

 03-30-2018
5.00
Installed ACS Ignition Switch Wiring
Details
       

 03-27-2018
6.00
Mounted PAI-700 Vertical Card Compass on Roll Bar
Details
       

 03-26-2018
4.50
Installed WxWORX XM/WX Satellite Weather Receiver
Details
       

 03-20-2018
9.00
Installed (2) Appareo Stratus USB Charging Ports
Details
       

 03-13-2018
7.00
Installed EchoUAT ADSB replacing NAVWORX ADS600
Details
       

 03-10-2018
22.00
Replaced Modified Brake Reservoir and Resealed all
Details
       

 12-11-2017
3.00
Repaired Brake Reservoir Welded Flanges
Details
     

 12-09-2017
4.00
Removed oil and fuel pressure sending units from c
Details
       

 12-07-2017
5.00
Secured Wing Tip Lights and Mounted Wing Tips
Details
       

 10-02-2017
12.00
Fiberglass Wing Tip Reinforcement Strip cont.
Details
       

 09-11-2017
14.00
Fiberglass Wing Tip Reinforcement Strip
Details
       

 08-09-2017
4.00
Installed New Main Gear Tire & Safety Wired Brakes
Details
       

 08-07-2017
9.50
Installed the Nosewheel Gear Leg, Main Fork, Stops
Details
       

 08-02-2017
6.50
Nosewheel and Tire Build-up
Details
       

 08-01-2017
4.50
Brake Line Installation & Cut Wheel
Details
       

 07-31-2017
5.00
Main Wheels & Tires Build-up
Details
       

 07-30-2017
4.00
More pics of brake and wheels
Details
       

 07-29-2017
9.00
Main Landing Gear Brake and Wheel Cont.
Details
       

 07-28-2017
9.00
Installing the Main wheels and brakes
Details
       

 07-27-2017
4.50
Installed the Main Landing Gear
Details
       

 07-26-2017
4.00
Installed the Engine/Nosewheel Landing Gear Mount
Details
       

 07-25-2017
5.00
New computer space and parts spaces
Details
       

 07-24-2017
5.00
Rearranged shop to mount the engine & propeller
Details
       

 06-29-2017
12.00
Oil Pressure and Fuel Pressure Sending Units
Details
       

 06-27-2017
12.00
Oil Temp/Fuel Flow/EGT/CHT & Air Temp sensor wirin
Details
       

 06-24-2017
4.00
Right/Left Resistive Float Fuel Level Senders to E
Details
       

 06-23-2017
4.00
More EIS Wiring and Sensor/Component Installation
Details
       

 06-19-2017
18.00
Began wiring the GRT EIS
Details
       

 06-13-2017
4.00
Completed Garmin GMA 240 Audio Panel Wiring
Details
       

 06-11-2017
18.00
Completed GRT EFIS Connections
Details
       

 06-06-2017
10.00
Completed Final GRT AHRS Connections
Details
       

 06-02-2017
6.00
Mounted the Grand Rapids Technologies (GRT) GPS RA
Details
       

 06-01-2017
45.00
KITLOG PROGRAM FAILURE
Details

 05-02-2017
1.00
Garmin GNS 430W (continued)
Details
       

 05-01-2017
15.00
Completed Garmin GNS 430W WAAS COM/NAV Radio
Details
       

 04-30-2017
15.00
ICOM 210A Communications Radio Installed
Details
       

 04-29-2017
1.00
Completed sample of spreadsheets I developed
Details
       

 04-27-2017
12.00
Completed Garmin GDU 370 NAV System Wiring
Details
       

 04-26-2017
9.00
Avionics, Radio, & Equipment List
Details
     

 04-25-2017
10.00
Autopilot NAV Signal Control Switch
Details
       

 04-24-2017
15.00
Completed TruTrack DigiFlight Autopilot Wiring
Details
       

 04-19-2017
10.00
Finished DYNON EFIS/Magnetometer/PC Wiring
Details
       

 04-17-2017
10.00
Finished GTX 327 Transponder Integration Wiring
Details
       

 04-12-2017
8.00
Completed all NavWorx ADS60-EXP wiring
Details
       

 04-11-2017
10.00
Nutplates installed for all non-Garmin equipment
Details
       

 04-10-2017
10.00
Grand Rapids Technologies Engine Information Syste
Details
       

 04-09-2017
3.00
Grand Rapids HX EFIS Harness Cont.
Details
       

 04-08-2017
8.00
Inside of GNS 430W rack showing back plate
Details
       

 04-07-2017
10.00
Grand Rapids HX EFIS Harness Build-Up
Details
       

 04-06-2017
1.00
More Built-up Harnesses for GNS 430W
Details
       

 04-05-2017
40.00
GNS 430W COM/NAV Radio Harnesses
Details
       

 04-03-2017
65.00
Created an Integration Schematic
Details
       

 03-04-2017
1.00
Integration Schematic cont.
Details
       

 01-30-2017
24.00
Wired GMA 240 Audio Panel to headset jacks & grips
Details
       

 10-01-2016
8.00
Wire Marker Beacon Receiver
Details
       

 09-05-2016
11.50
Continued wiring AOA CPU, Controls, & Indicator
Details
       

 09-03-2016
3.00
Wiring AOA Flap Switch
Details
       

 09-02-2016
12.50
Wiring Advanced Systems Angle of Attack Indicator
Details
       

 09-01-2016
7.50
Completed Flap System Wiring
Details
       

 08-31-2016
9.00
Completed wiring for the FlightStream 210
Details
       

 05-17-2016
4.00
Organized remaining wiring
Details
       

 05-16-2016
12.00
Completed wiring on TCW and GRT Backup Batteries
Details
       

 05-14-2016
18.00
Received, Installed, and wired PowerGuard Module
Details
       

 05-12-2016
4.00
Verified completed wiring with Excel Integration
Details
       

 05-10-2016
4.00
Completed Elevator/Aileron Trim Wiring & Clock
Details
       

 04-30-2016
10.00
Verify/Completed all wiring for panel and instrume
Details
       

 03-29-2016
50.00
Installing Audio Panel & Created New Spreadsheet
Details
       

 03-21-2016
3.00
ELT Antenna Stabilizer Mount
Details
     

 03-15-2016
15.00
Installed NavWorx ADSB and the UAT Antenna
Details
       

 01-05-2016
10.00
Pulled all wires from wings and fuselage to cockpi
Details
       

 12-27-2015
20.00
Completed all wiring for grips, indicators, trim s
Details
       

 12-15-2015
20.00
Connected wires for both stick grips, trim servos,
Details
       

 12-07-2015
6.00
Install Tosten Stick Grips
Details
       

 11-21-2015
16.00
Garmin Flightstream 210 Bluetooth Interface
Details
       

 11-16-2015
19.00
GRT AHRS & Autopilot Pitch Servo Wiring Harness
Details
       

 11-13-2015
45.00
Backup Batteries for Critical Systems
Details
       

 11-12-2015
10.00
Left Wing Root Wires completed with Molex Connecto
Details
       

 11-10-2015
10.00
Left Wing Wiring terminated in Molex Connectors an
Details
       

 11-09-2015
10.00
Right Wing Root Wires completed with Molex Connect
Details
       

 11-07-2015
30.00
Right wing wires completed with labels
Details
       

 11-06-2015
10.00
Left & Right Wing Wiring Schmatics & Labels
Details
       

 11-05-2015
3.00
Installing outside air temp sensor
Details
       

 11-04-2015
8.00
ELT System Test Light & Test Warning Horn, Dynon E
Details
       

 11-03-2015
10.00
Installed cockpit & baggage compartment lighting
Details
       

 11-02-2015
3.00
Finishing the cooling fan wiring
Details
     

 11-01-2015
150.00
Building the Electrical System Schematics
Details
       

 03-26-2015
12.00
First wires routed to the dropdown terminal panel
Details
       

 03-12-2015
6.00
Clock Countdown Warning Tone Speaker
Details
       

 03-09-2015
12.00
Avionics Cooling Fan (cont.)
Details
       

 03-06-2015
10.00
Avionics Cooling Fan (continued)
Details
       

 03-05-2015
15.00
Install Avionics Cooling Fan Ducting
Details
       

 02-27-2015
9.00
Install avionics cooling fan & fabicate mounting b
Details
       

 02-21-2015
6.00
"New & Improved" terminal end, hinged, drop down p
Details
       

 02-19-2015
21.00
New Terminal-End Drop-Down Panel
Details
       

 02-12-2015
4.00
AOA Control Module -- installed nutplates
Details
       

 02-10-2015
8.50
Installing the Whisperflow SV Ventilators
Details
       

 02-09-2015
11.00
Installing fresh air ventilators and CAT ducting
Details
       

 02-06-2015
15.00
Original Terminal-End Drop-down Panel
Details
       

 02-02-2015
10.00
Rewired strobe shielded wires to ground
Details
       

 01-30-2015
80.00
Rewired all previously installed wiring in fuselag
Details
       

 01-22-2015
40.00
Body-Filler to remove dents and reprime
Details
       

 07-15-2014
10.00
Moved ELT Antenna to a different location
Details
       

 07-15-2014
10.00
More Static-Pitot connections to instruments
Details
       

 06-23-2014
10.00
Installed the pitot-static system
Details
       

 06-22-2014
10.00
Pitot-Static System installation
Details
       

 03-03-2014
9.00
Installed Dynon Remote Compass below vertical stab
Details
       

 03-01-2014
10.00
Build Dynon Remote Compass Mounts
Details
       

 02-28-2014
15.00
More on Magnetometer (remote compasses) install
Details
       

 02-26-2014
16.00
Magnetometers mounted in fuselage failed test
Details
       

 02-07-2014
2.00
Dimple the wings and mark the riveting direction f
Details
       

 02-06-2014
35.00
Installing the wing tip spars and nut bolts
Details
       

 01-28-2014
14.00
Fiberglass wing tip triming and fitting
Details
       

 01-17-2014
15.00
Tested the wingtip lights and Magnetometers
Details
       

 01-16-2014
8.00
Rewire Strobe, Landing, Taxi, and Nav Lights in Fi
Details
       

 01-13-2014
12.00
Fiberglass Wing Tip Re-Wire
Details
       

 01-11-2014
12.00
Installed GRT and Dynon Magnetometers
Details
       

 01-10-2014
10.00
Pulled all wiring out of wings and encased in plas
Details
       

 01-08-2014
2.00
Re-evaluated wiring in wings
Details
       

 01-07-2014
3.00
Re-setup shop to start building after a year and a
Details
       

 04-28-2012
8.00
Misc electrical system pictures
       

 04-28-2012
6.00
Dimmer switch, Electronic Ignition, Grounding bloc
       

 04-21-2012
20.00
Main and Always Hot Fuse and Distribution Panels
Details
       

 04-14-2012
10.00
Main power feeds from master and battery relays
       

 04-07-2012
5.00
Wiring microphone and headset jacks
Details
       

 04-07-2012
5.00
Headset and Microphone Jack install
       

 04-04-2012
2.00
Cockpit Lights Installed
Details
       

 04-03-2012
5.00
Soldering wires for cockpit lights
Details
       

 09-12-2011
4.00
Vertical Stabilizer Fiberglass Tips Installed
Details
       

 08-27-2011
10.00
Tail fiberglass and wiring
Details
       

 08-20-2011
10.00
Tail Strobe and Nav Light Wiring
Details
       

 08-14-2011
4.00
Bottom Rudder Horn Fiberglass Install
Details
       

 08-13-2011
5.00
Install fiberglass tips on rudder
Details
       

 08-08-2011
12.00
Install ELT, antenna, and remote
Details
       

 08-05-2011
15.00
Instruments installed in the panel
Details
     

 06-17-2011
5.00
Wiring for battery & master and starter relays
Details
       

 06-12-2011
6.00
Fabricated radio panel stack
Details
       

 06-11-2011
12.00
Fabricate Panel Braces & rivet subpanels
Details
       

 06-10-2011
4.00
Fabricate Rudder Cable Linkage
Details
       

 04-30-2011
20.00
Beginning to install avionics
Details
       

 04-23-2011
10.00
Panel dash board temporarily fitted
Details
       

 04-16-2011
5.00
More Pictures of the interior and seats
Details
       

 04-09-2011
45.00
Continued panel cutouts
Details
       

 03-26-2011
8.00
Received Seats, Interior, and Upholstery
Details
       

 03-26-2011
35.00
Began cutouts for instrument panel
Details
       

 03-12-2011
8.00
Fabricate & Install Battery Carrier & Battery
Details
       

 03-06-2011
8.00
More Communications Antennas
Details
       

 03-05-2011
8.00
Communications Antennas
Details
       

 05-05-2010
3.00
Install the GRT AHRS Mounting Bracket
Details
       

 05-03-2010
3.00
Install AHRS Bracket
Details
       

 08-30-2009
8.00
Fit and Drill Instrument Panel Forward Top Skin
Details
       

 08-16-2009
8.00
Forward Deck Ribs and Subpanel Assembled
Details
       

 08-15-2009
16.00
Fabricate Front Deck Reinforcement Plate and Angle
Details
       

 08-08-2009
4.00
Install Rudder Cable & Fabricated
Details
       

 08-01-2009
4.50
Installing the Rudder Stops & Rudder Cables
Details
       

 07-25-2009
5.00
Building the Rudder Stops
Details
       

 07-18-2009
4.50
Fitting the Rudder
Details
       

 06-20-2009
8.00
Final Installation of the Vertical Stabilizer
Details
       

 06-14-2009
6.00
Final Fitting/Install of the Vertical Stabilizer
Details
       

 06-13-2009
5.00
Installing VOR/ILS Antenna in Vertical Stabilizer
Details
       

 06-12-2009
4.00
Fitting the Vertical Stabilizer--Aligning the VS
Details
       

 06-07-2009
1.00
Fitting the Vertical Stabilizer--Rear Spar Align
Details
       

 06-06-2009
8.00
Fitting the Vertical Stabilizer
Details
       

 06-05-2009
4.00
Fitting the Vertical Stabilizer--Rear Bulkhead
Details
       

 05-29-2009
4.00
Fitting the Vertical Stabilizer -- Forward Spar
Details
       

 05-28-2009
1.00
More pics of access panels
Details
       

 05-27-2009
4.00
Install Nutplates & Access Panels on Aft Elevator
Details
       

 05-26-2009
3.00
Installing/Adjusting the elevator trim tab motor l
Details
       

 05-24-2009
2.00
Completed install of Tru-track Autopilot Elevator
Details
       

 05-23-2009
6.00
Install the Tru-Trac Autopilot Elevator Servo
Details
       

 05-16-2009
6.00
Fabricate Elevator Stops
Details
       

 05-09-2009
4.00
Elevator Pushrod Installation
Details
       

 05-08-2009
3.00
Installing Elevator Push-Pull Tube
Details
       

 05-07-2009
2.50
Aligning Horizontal Stab for 0 Degree Incidence
Details
       

 04-26-2009
2.00
Fitting the Horizontal Stabilizer to the Fuselage
Details
       

 04-25-2009
4.00
Trimming Horizontal Stabilizer for Elevator Swing
Details
       

 04-24-2009
2.00
Trimming Horizontal Stabilizer for Elevator Swing
Details
       

 04-20-2009
2.00
Trimming Horizontal Stabilizer for Elevator Swing
Details
       

 04-18-2009
4.00
Drilling the Elevator Horns
Details
       

 04-14-2009
1.00
Attaching Springs to Aileron Trim System
       

 04-13-2009
3.50
Mounting Aileron Trim Assembly
Details
       

 04-10-2009
6.00
Fabricating and Installing Electric Aileron Trim S
Details
       

 04-07-2009
3.50
Installed Flap Positioning System and Wiring
Details
       

 04-05-2009
2.50
Install ELT Mounting Bracket
Details
       

 04-04-2009
3.00
Dual Brake lines installed (Bonaco Brained Steel)
       

 04-01-2009
0.00
Dual System Bonaco Brake Lines Installed
Details
       

 04-01-2009
0.00
Bonaco Brake Lines installed
       

 03-31-2009
1.00
Dual Brake lines installed
Details
       

 03-30-2009
8.00
Install Bonaco Fuel Lines Valve to Wings
Details
       

 03-28-2009
13.50
Fuel Line--Fuel Pump to Engine & Wing Vent Lines
Details
       

 03-28-2009
2.00
Fitting the Horizontal Stabilizer (continued)
Details
       

 03-15-2009
3.00
Installing fuel lines from boost pump to engine
Details
       

 03-14-2009
1.00
Fuel Pump Assembly -- Continued
Details
       

 03-13-2009
13.00
Airflow Performance Fuel Boost Pump Assembly
Details
       

 03-06-2009
3.00
Assembling Aerflow Performance Fuel Pump
Details
       

 03-03-2009
0.00
Modified Fuel Selector Cover Plate
Details
       

 03-01-2009
6.00
Painting the cockpit in "Hammered Aluminum"
Details
       

 02-28-2009
18.00
Installing High Pressure Electric Fuel Pump Cover
Details
       

 02-21-2009
3.00
Modified Angle Of Attack Drain
Details
       

 02-14-2009
10.00
Removed wings, added nutplates for bottom skin, fi
Details
       

 02-09-2009
1.00
Setting Flap Extension
Details
       

 02-07-2009
3.00
Re-rigging the ailerons & flaps
Details
       

 02-06-2009
0.00
Flap pushrod holes from the side of the fuselage
Details
       

 02-05-2009
3.00
Cutting the flap push rod holes in the fuselage
Details
       

 02-03-2009
4.00
Installing and Trimming Flaps
Details
       

 02-02-2009
2.00
Trim Flaps and Temporarily Install Flap Push Rods
Details
       

 01-31-2009
8.00
Rigging the Ailerons
Details
       

 01-30-2009
4.00
Rig the Control Column to the Ailerons
Details
       

 01-26-2009
3.00
Fabricate Flap Push Rods
Details
       

 01-25-2009
5.00
Setting the Aileron Stop Upward Travel Limits
Details
       

 01-24-2009
4.00
Continue Install Aileron Upward Travel Stops
Details
       

 01-23-2009
1.00
Build/Install Aileron Stops
Details
       

 01-21-2009
3.00
Installing the fuel tank attachment brackets
Details
       

 01-19-2009
4.00
Fabricating Fuel Tank Attach Brackets
Details
       

 01-15-2009
2.50
Final Drilling Rear Spar Bolt Holes & Flange Screw
Details
       

 01-14-2009
2.50
Setting the Wing Incidence
Details
       

 01-13-2009
3.00
Setting Wing Sweep and Incidence
Details
       

 01-12-2009
3.00
Setting Wing Sweep & Incidence
Details
       

 01-09-2009
3.00
Setting the wing Sweep and Incidence
Details
       

 01-05-2009
2.00
Leveling the fuselage to prepare for wing sweep
Details
       

 01-03-2009
7.00
Attaching Wings to the fuselage
Details
       

 01-02-2009
6.00
Building wing-mount stands
Details
     

 12-28-2008
10.00
Preparation to attach wings to the fuselage
Details
       

 12-25-2008
0.00
My Daughter's Christmas Present
Details
       

 09-15-2008
14.00
Main Landing Gear Mounts
Details
       

 08-30-2008
16.00
Flap Motor Assembly
Details
       

 08-24-2008
4.00
Electirc Flap Assembly Fabrication
Details
       

 08-23-2008
6.00
More Stick Boot Ring Fabrication
Details
       

 08-21-2008
2.00
Fabrication of Stick Boot Rings
Details
       

 08-19-2008
8.00
Center Console Fabrication and Installation
Details
       

 08-11-2008
3.00
Electrical Conduit in the baggae area
Details
       

 08-10-2008
1.00
Recieived XIO-360-M1B Lycoming 180 hp Engine
Details
       

 08-09-2008
0.50
More Propeller Pics
       

 08-08-2008
1.00
Received Hartzel Constant Speed Propeller
Details
       

 08-06-2008
3.00
Installing the strobe pack mounting bracket
Details
       

 08-05-2008
1.50
Shoulder Harness Cable rub blocks
Details
       

 08-02-2008
6.00
Installing the F-6111 ribs to the aft top skin
Details
       

 07-29-2008
2.00
Fit the forward top skin; aft fuselage
Details
       

 07-27-2008
3.00
Fabricated and installed Elevator Bellcrank
       

 07-21-2008
5.00
Fabricate rear canopy plate
Details
       

 07-12-2008
9.00
Completed Rudder Pedal and Brake Assembly installe
Details
       

 07-11-2008
6.00
Fabricate and install the rudder pedals and brakes
Details
       

 07-07-2008
4.50
Cut Holes for Landing Gear Sockets and Brake Lines
Details
       

 06-30-2008
4.00
Finished the external steps
Details
       

 06-21-2008
14.00
Cut the holes for the external steps
Details
       

 06-18-2008
2.50
Tail tie down assembly
Details
       

 06-11-2008
2.50
Installed rivets in Bulkhead
Details
     

 06-08-2008
10.00
Assembled and mounted control column
Details
       

 06-02-2008
2.00
Installed rivets in bulkhead side channels
Details
       

 06-01-2008
10.00
Started Fabricating Seatback Brace Receiver Plates
Details
       

 05-31-2008
4.00
Installed Electrical Grommets and Marked Firewall
Details
       

 05-30-2008
0.00
Pictures of the Fuselage
Details
       

 05-30-2008
0.00
More Pictures of the fuselage
Details
       

 05-29-2008
7.00
Fabricated Brackets for Control Stick Access
Details
       

 05-29-2008
5.00
Brake Bracket & Firewall Recess
Details
       

 05-28-2008
15.00
Finished Right and Left Seat Back
Details
       

 05-10-2008
2.00
Cut and attach hinges to braces
Details
       

 05-09-2008
1.00
Tunnel Cover between seat backs
Details
       

 05-08-2008
4.00
Tunnel Cover between the seat backs
Details
       

 05-07-2008
2.50
Seat Braces and Angle Braces
Details
       

 05-05-2008
1.00
More work on seat back braces
Details
       

 05-05-2008
1.50
Fabricate Seat Backs
Details
       

 05-03-2008
5.00
Fabricate and install tail strobe and position lig
Details
       

 04-30-2008
4.50
Right Wing Tip Lights and Lens
Details
       

 12-16-2007
4.50
Cutting and Installing the left Wing Tip Lens Cove
Details
       

 12-10-2007
5.00
Wing Tip Nav, Strobe, and Landing Light Assemblies
Details
       

 12-08-2007
7.00
More wing tip work on the other wing
Details

 12-03-2007
6.50
Fabricating the Landing & Taxi Light Brackets
Details
       

 12-01-2007
7.00
Finished Wiring the Wings
Details
       

 11-24-2007
5.50
planning my electrical system, pulling wires, and
Details
       

 11-15-2007
3.00
GRT Magnetometer, Gretz Heated Pitot , and Landing
Details
       

 11-14-2007
1.50
Installed GRT Magnetometer
Details
       

 11-13-2007
3.00
Install Right Wing Flap Hinge
Details
       

 11-12-2007
6.50
Installed the right wing aileron and scarfed skin
Details
       

 11-12-2007
4.50
Dimpled skin and installed flap hinge
Details
       

 11-11-2007
3.50
Install right wing aileron brackets
Details
       

 11-10-2007
2.00
Install Right Wing Aileron Gap Fairing
Details
       

 11-09-2007
2.50
Install Right Wing Flap Brace
       

 11-08-2007
2.00
Right Wing Inboard Aileron Bracket
       

 11-07-2007
2.50
Install Right Wing outboard Aileron Bracket
Details
       

 11-05-2007
2.50
Final installation of the wing landing light
Details
       

 11-04-2007
2.00
Finish installation of leading edge landing light
Details
       

 11-03-2007
3.50
Installed Leading Edge Landing Light; Right Wing
Details
       

 11-02-2007
3.50
Install Tru-Trac Roll Servo in right wing
Details
       

 11-01-2007
0.50
Install Tie Down on the right wing
Details
       

 11-01-2007
4.50
Install Right Wing Electrical Conduit
Details
       

 10-29-2007
2.50
Dimpled the left wing lower skin and scarfed the e
Details
       

 10-27-2007
6.00
Fabricate, install, and seal fuel level senders
Details
     

 10-26-2007
4.50
Install Flap Hinge and Left Flap
Details
       

 10-26-2007
0.00
Completed install of flaps and ailerons (Left wing
Details
       

 10-23-2007
2.50
Installing Aileron
Details
       

 10-22-2007
4.00
Attaching the Left Aileron to the wing
       

 10-20-2007
10.00
GRT Magnetometer Installation
Details
       

 10-19-2007
12.00
More pitot work
Details
       

 10-18-2007
8.00
Continued work on Gretz Heated Pitot
Details
       

 10-06-2007
5.00
Pitot Tube installation
Details
       

 10-02-2007
3.00
Installed wiring conduit
Details
     

 09-29-2007
3.00
Install outboard aileron bracket and fairing
Details
     

 09-27-2007
4.00
Building and installing the aileron brackets
Details
     

 09-22-2007
14.50
Installed leading edge landing light
Details
       

 09-19-2007
6.00
Install Aileron Pushrods
Details
       

 09-15-2007
5.50
Left Wing Belcrank Installation
     

 06-28-2007
3.00
Started working on left wing
Details

 06-23-2007
12.00
Building the Trim Tab
Details
     

 06-17-2007
11.50
Left Elevator
Details
       

 06-15-2007
15.00
Started on the Left Elevator
Details
       

 06-07-2007
0.00
More EAA Pics
Details
       

 06-07-2007
3.00
EAA 'Sleeping Giant' Chapter 344 Club Meeting
Details
       

 06-03-2007
5.00
Preparing for EAA Chapter 344 Meetrng
Details
       

 06-03-2007
0.00
More EAA Chapter 344 Preparation
Details
       

 06-03-2007
0.00
More EAA Chapter 344 Preparation
Details
       

 06-02-2007
6.00
Prepared for EAA Chapt 344 Visit
Details
       

 05-27-2007
9.00
Finished the Left Elevator
Details
       

 05-26-2007
7.50
More Elevator Work
Details
       

 05-25-2007
10.50
Started work on the left elevator
Details
       

 05-25-2007
10.50
Back Riveting the Elevator Stifners
Details
       

 05-07-2007
4.50
Preparing the Right Elevator
Details
     

 04-21-2007
8.00
Preparing the Elevator Skins and Stiffners
Details

 04-14-2007
4.50
Building the Elevators
Details
     

 03-23-2007
1.00
Finished Rudder less fiberglass tips
Details
       

 03-22-2007
0.00
Rolling the Rudder Leading Edge
Details
       

 03-21-2007
3.00
Rolling the Rudder Leading Edge
Details
       

 03-21-2007
2.50
Riveting the Rudder skin and trailing edge wedge
Details
       

 03-20-2007
5.50
Preparing the Rudder Skins for riveting
Details
       

 03-18-2007
9.50
Building the Rudder Counterweight Balance and Skin
Details
       

 03-14-2007
5.50
Building the Rudder skeleton
Details
       

 03-11-2007
4.50
Riveting stiffners to the rudder skin
Details
       

 03-10-2007
8.00
Fitting the stiffners to the Rudder skins
Details
       

 03-05-2007
3.50
Building the rudder
Details
       

 03-03-2007
4.00
Finished riveting the Horizontal Stabilizer
Details
       

 02-26-2007
23.50
Riveting the Horizontal Stabilizer Skin (right & l
Details
       

 02-19-2007
14.00
Riveting the Horizontal stabilizer (steps 36 - 54)
Details
       

 02-18-2007
12.00
Horizontal Stabilizer Front Spar Assembly
Details
       

 02-17-2007
12.00
Horizontal Stabilizer Rear Spar Assembly, ribs, an
Details
       

 02-17-2007
12.00
Front Spar Assembly of the Horizontal Stabilizer (
Details
       

 02-14-2007
2.50
Building the rudder skeleton
Details
       

 02-13-2007
1.00
Building the Horizontal Stabilizer Rear Spar Assem
Details
       

 02-09-2007
0.00
Quickbuild wings and fuselage (& finish kit) arriv
Details
       

 02-09-2007
0.00
Quickbuild wings and fuselage (& finish kit) arriv
Details
       

 02-09-2007
0.00
Quickbuild wings and fuselage (& finish kit) arriv
Details
       

 02-09-2007
0.00
Quickbuild wings and fuselage (& finish kit) arriv
Details
       

 02-09-2007
0.00
Quickbuild wings and fuselage (& finish kit) arriv
Details
       

 02-09-2007
2.00
QuickBuild Fuselage and Wings arrive
Details
       

 02-04-2007
2.00
Finishing the Vertical Stabilizer
Details
       

 02-03-2007
14.00
Finishing the Vertical Stabilizer (steps 14-17)
Details
       

 01-31-2007
5.50
Finishing the Vertical Stabilizer (steps 11-13)
Details
       

 01-27-2007
12.00
Building the vertical stabilizer; steps 3-10
Details
       

 01-24-2007
3.50
Building the Vertical Stabilizer
Details
       

 01-11-2007
0.00
More tools
       

 01-09-2007
4.00
Unpacking and Organizing Tools
Details
       

 01-09-2007
10.00
Unpacking and organizing the Empenage Kit
Details
       

 01-09-2007
24.00
More shop pictures
Details
       

 12-28-2006
1.00
Picked up Empenage Kit at Vans
Details
       

 12-28-2006
4.00
2nd Visit to Van's
Details
       

 12-28-2006
2.00
2nd Visit to Van's
       

 10-28-2006
0.00
Building Workshop
Details
       

 07-05-2006
3.00
1st RV-7A Demo Flight
       










Copyright © 2001-2024 Matronics. All Rights Reserved.