Work Logs Found: 86
Category Work Time: 1085 Hours
 Date
Hours
Work Log Summary

Details

 07-28-2020
9.00
New battery, Redesigned Hold-Down, Moved Alt-Air
Details
       

 07-14-2020
5.00
Install New Panel LED Lights
Details
       

 11-07-2018
2.00
Tied Wire Bundles (Continued)
Details
       

 11-07-2018
2.00
Tied Wire Bundles (Continued)
Details
       

 11-06-2018
2.00
Tied Wire Bundles (Continued)
Details
       

 11-05-2018
5.00
Tied all electrical wires into bundles
Details
       

 08-29-2018
1.50
Adjusted Elevator Trim to Center Pitch-Trim Indica
Details
       

 05-05-2018
6.00
Found Electrical Fault in Aileron Trim Servo
Details
       

 04-10-2018
7.00
Installed Alternator Warning Light and Alternator
Details
       

 04-08-2018
5.00
Installed UNISON Slick LASAR Low Voltage Control H
Details
       

 03-20-2018
9.00
Installed (2) Appareo Stratus USB Charging Ports
Details
       

 06-29-2017
12.00
Oil Pressure and Fuel Pressure Sending Units
Details
       

 06-27-2017
12.00
Oil Temp/Fuel Flow/EGT/CHT & Air Temp sensor wirin
Details
       

 06-24-2017
4.00
Right/Left Resistive Float Fuel Level Senders to E
Details
       

 06-23-2017
4.00
More EIS Wiring and Sensor/Component Installation
Details
       

 06-19-2017
18.00
Began wiring the GRT EIS
Details
       

 06-13-2017
4.00
Completed Garmin GMA 240 Audio Panel Wiring
Details
       

 06-11-2017
18.00
Completed GRT EFIS Connections
Details
       

 06-06-2017
10.00
Completed Final GRT AHRS Connections
Details
       

 06-02-2017
6.00
Mounted the Grand Rapids Technologies (GRT) GPS RA
Details
       

 05-02-2017
1.00
Garmin GNS 430W (continued)
Details
       

 05-01-2017
15.00
Completed Garmin GNS 430W WAAS COM/NAV Radio
Details
       

 04-30-2017
15.00
ICOM 210A Communications Radio Installed
Details
       

 04-29-2017
1.00
Completed sample of spreadsheets I developed
Details
       

 04-27-2017
12.00
Completed Garmin GDU 370 NAV System Wiring
Details
       

 04-26-2017
9.00
Avionics, Radio, & Equipment List
Details
     

 04-25-2017
10.00
Autopilot NAV Signal Control Switch
Details
       

 04-24-2017
15.00
Completed TruTrack DigiFlight Autopilot Wiring
Details
       

 04-19-2017
10.00
Finished DYNON EFIS/Magnetometer/PC Wiring
Details
       

 04-17-2017
10.00
Finished GTX 327 Transponder Integration Wiring
Details
       

 04-12-2017
8.00
Completed all NavWorx ADS60-EXP wiring
Details
       

 04-11-2017
10.00
Nutplates installed for all non-Garmin equipment
Details
       

 04-10-2017
10.00
Grand Rapids Technologies Engine Information Syste
Details
       

 04-09-2017
3.00
Grand Rapids HX EFIS Harness Cont.
Details
       

 04-08-2017
8.00
Inside of GNS 430W rack showing back plate
Details
       

 04-07-2017
10.00
Grand Rapids HX EFIS Harness Build-Up
Details
       

 04-06-2017
1.00
More Built-up Harnesses for GNS 430W
Details
       

 04-05-2017
40.00
GNS 430W COM/NAV Radio Harnesses
Details
       

 04-03-2017
65.00
Created an Integration Schematic
Details
       

 03-04-2017
1.00
Integration Schematic cont.
Details
       

 01-30-2017
24.00
Wired GMA 240 Audio Panel to headset jacks & grips
Details
       

 09-05-2016
11.50
Continued wiring AOA CPU, Controls, & Indicator
Details
       

 09-03-2016
3.00
Wiring AOA Flap Switch
Details
       

 09-01-2016
7.50
Completed Flap System Wiring
Details
       

 05-17-2016
4.00
Organized remaining wiring
Details
       

 05-16-2016
12.00
Completed wiring on TCW and GRT Backup Batteries
Details
       

 05-14-2016
18.00
Received, Installed, and wired PowerGuard Module
Details
       

 05-12-2016
4.00
Verified completed wiring with Excel Integration
Details
       

 05-10-2016
4.00
Completed Elevator/Aileron Trim Wiring & Clock
Details
       

 04-30-2016
10.00
Verify/Completed all wiring for panel and instrume
Details
       

 01-05-2016
10.00
Pulled all wires from wings and fuselage to cockpi
Details
       

 11-13-2015
45.00
Backup Batteries for Critical Systems
Details
       

 11-12-2015
10.00
Left Wing Root Wires completed with Molex Connecto
Details
       

 11-10-2015
10.00
Left Wing Wiring terminated in Molex Connectors an
Details
       

 11-09-2015
10.00
Right Wing Root Wires completed with Molex Connect
Details
       

 11-07-2015
30.00
Right wing wires completed with labels
Details
       

 11-06-2015
10.00
Left & Right Wing Wiring Schmatics & Labels
Details
       

 11-05-2015
3.00
Installing outside air temp sensor
Details
       

 11-04-2015
8.00
ELT System Test Light & Test Warning Horn, Dynon E
Details
       

 11-03-2015
10.00
Installed cockpit & baggage compartment lighting
Details
       

 11-01-2015
150.00
Building the Electrical System Schematics
Details
       

 03-26-2015
12.00
First wires routed to the dropdown terminal panel
Details
       

 03-12-2015
6.00
Clock Countdown Warning Tone Speaker
Details
       

 03-09-2015
12.00
Avionics Cooling Fan (cont.)
Details
       

 03-06-2015
10.00
Avionics Cooling Fan (continued)
Details
       

 03-05-2015
15.00
Install Avionics Cooling Fan Ducting
Details
       

 02-27-2015
9.00
Install avionics cooling fan & fabicate mounting b
Details
       

 02-21-2015
6.00
"New & Improved" terminal end, hinged, drop down p
Details
       

 02-19-2015
21.00
New Terminal-End Drop-Down Panel
Details
       

 02-06-2015
15.00
Original Terminal-End Drop-down Panel
Details
       

 02-02-2015
10.00
Rewired strobe shielded wires to ground
Details
       

 01-30-2015
80.00
Rewired all previously installed wiring in fuselag
Details
       

 04-28-2012
8.00
Misc electrical system pictures
       

 04-28-2012
6.00
Dimmer switch, Electronic Ignition, Grounding bloc
       

 04-21-2012
20.00
Main and Always Hot Fuse and Distribution Panels
Details
       

 04-14-2012
10.00
Main power feeds from master and battery relays
       

 04-07-2012
5.00
Wiring microphone and headset jacks
Details
       

 04-07-2012
5.00
Headset and Microphone Jack install
       

 04-04-2012
2.00
Cockpit Lights Installed
Details
       

 04-03-2012
5.00
Soldering wires for cockpit lights
Details
       

 08-20-2011
10.00
Tail Strobe and Nav Light Wiring
Details
       

 06-17-2011
5.00
Wiring for battery & master and starter relays
Details
       

 03-12-2011
8.00
Fabricate & Install Battery Carrier & Battery
Details
       

 12-01-2007
7.00
Finished Wiring the Wings
Details
       

 11-24-2007
5.50
planning my electrical system, pulling wires, and
Details
       

 11-15-2007
3.00
GRT Magnetometer, Gretz Heated Pitot , and Landing
Details
       