Powered By Kitlog Pro v2.0
Larry Winger's 601XL Project
Zodiac CH 650
Work Area
7-22-2006
< Previous Log Entry
Next Log Entry >
Date:
7-22-2006
Number of Hours:
0.00
Manual Reference:
Brief Description:
General work area prep
Fixed the switch plate cover on the drill press. Cut, routed and attached plywood tops for the two Husky X-stands that hold the router table and oscillating sander. Re-leveled the router table insert. (Time: 3.25 hours)
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Zodiac CH 650 Home
Category
# Logs
# Hours
All
1084
3152
Avionics
77
284
Empennage
93
231
Engine
87
293
Fuselage
306
915
Miscellaneous
132
294
None
2
Planning
22
21
Shop Supplies
1
2
Tools
22
4
Total Hours
32
Wings
296
1103
Work Area
14
5
Copyright © 2001-2025 Matronics. All Rights Reserved.