KitLog pro

Powered By Kitlog Pro v2.0

KENNETH T.'S WEB SITE
' style=
Date:  5-15-2007
Number of Hours:  4.00
Manual Reference:  6-4, 6-5, Dwg. 6
Brief Description:  Riveted the rear spar, doubler and hinge brackets.

Riveted the rear spar, doubler, and hnge brackets. I used the pneumatic squeezer set at 90 psi with good results. I could not reach the middle rivet on VS-410 hinge bracket and, therefore, I had to use the rivet gun and bucking bar for two rivets.

Squeezed the flush rivets on the bottom 10 holes of rear spar to rivet doubler and VS-410 hinge brackets.
Squeezed the universal rivets on the remaining holes on the doubler and hinge brackets being aware of the different lengths required. (Study the drawing!)
Used the rivet gun and bucking bar for the middle holes against the pin flange to get the final two rivets. The squeezer can't do them all, if only.
' style=

Using pneumatic squeeze rivets on rear spar.

Using pneumatic squeeze rivets on rear spar.

' style=

Charlotte using rivet gun while I buck.

Charlotte using rivet gun while I buck.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.