KitLog pro

Powered By Kitlog Pro v2.0

KENNETH T.'S WEB SITE
' style=
Date:  3-3-2013
Number of Hours:  4.50
Manual Reference:  Vans
Brief Description:  Brake, airblast tube, and empennage work.

We did some miscellaneous work today. I removed the brake pistons and swapped out the buna orings with viton orings to increase the operating temperature range. Experience says you'll eventually burn up the buna orings on a long quartering tailwind taxi. Don't ask!

We removed the aft baffles and riveted some 3/4" air blast flanged tubes that accepts 3/4" cat tubing. The flanged tubes were machined by one of our tech counselors.

The temperature got up to 78 today, so we accomplished the fiberglass cloth addition to the empennage fairing.
' style=

Which piston has the viton oring?

Which piston has the viton oring?

' style=

Removing the brake cylinders.

Removing the brake cylinders.

' style=

Charlotte spreading epoxied glass beads on the empennage fairing.

Charlotte spreading epoxied glass beads on the empennage fairing.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.