KitLog pro

Powered By Kitlog Pro v2.0

KENNETH T.'S WEB SITE
' style=
Date:  4-27-2013
Number of Hours:  5.00
Manual Reference:  Vans
Brief Description:  Used flox to cover the fairing juncture gap.

The electrical tape stayed on the fairing overnight. We applied more tape to the opposite side and to the other pant. We then mixed up some epoxy and flox. We thickened it enough so that it would not run when pulled by gravity. Unfortunately that makes it difficult to squeege on and smooth it to a straight line. We did our best but we know there will be a lot of sanding when it's cured.

We also decided to put the empennage fairing on after filling in some weak areas with filler and sanding. Hopefully we won't need to take it off for a while.
' style=

Covered gap with eletrical tape to keep the flox from adhereing to the aft fairing.

Covered gap with eletrical tape to keep the flox from adhereing to the aft fairing.

' style=

Flox applied to fore fairing half way across the tape to cover the gap.

Flox applied to fore fairing half way across the tape to cover the gap.

' style=

Installing the empennage fairing with #6 screws.

Installing the empennage fairing with #6 screws.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.