KitLog pro

Powered By Kitlog Pro v2.0

KENNETH T.'S WEB SITE
' style=
Date:  3-13-2013
Number of Hours:  3.00
Manual Reference:  Vans
Brief Description:  Riveted #4 baffle and then went flying.

Today John and I went to the hangar and riveted the #4 aft and oil cooler baffles together. Since I had modifed the oil cooler baffle for a larger oil cooler, it could not be riveted to the aft baffle with a hand or pneumatic squeezer, therefore, we used the rivet gun and bucking bar.

We then blew off work and went flying! I got about 1.5 hours of flying time. I logged one takeoff and two landings. It was great to be in the air after almost 9 years of not flying. Six of those years have been spent working on the RV-7A. I can't wait until I'm finished, but I guess I'll have to wait.
' style=

The baffles we riveted.

The baffles we riveted.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.