KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
' style=
Date:  10-24-2011
Number of Hours:  3.75
Manual Reference:  DWG83 and pg8-63
Brief Description:  Left and Right brake Lines installed in gear tower

1. Made templates for the aluminum brake lines in Gear towers and then made the bends. Took several trips back and forthe to get bends just right. Flared ends and snugged up. I will add some lock tight and torque up next time.

2. I received my 3 conducter shielded wire for the Aeroled tail light/strobe, so I ran it along the right side middle longeron along with the electric elevator trim tab wire and the static air line. Secured the wire where appropriate with zip ties and some vinyl tube as anti abrasion.

3. Clecoed the turtle deck in place in preperation for rivitting on the next session possibly.
' style=

Rt side brake line

Rt side brake line

' style=

L and R brake lines installed and snugged up

L and R brake lines installed and snugged up

' style=

Wire for tail section secured to longeron with zip ties and  vinyl tube for antiabrasion

Wire for tail section secured to longeron with zip ties and vinyl tube for antiabrasion

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.