KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  5-8-2014
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Helped Defuel and Weigh Aircraft

Randy Brooks helped drain fuel out of the tanks. We then laid the scales into position and raised the tail onto a platform with a scale on it. A few small plywood boards were added under the tail wheel to raise the fuselage into a level attitude. The empennage fairing was laid in place, along with other pieces not yet attached to the aircraft.
' style=

The tail with the empennage fairing

The tail with the empennage fairing

' style=

The aircraft in a level attitude

The aircraft in a level attitude

' style=

Wheel pants and gear fairings laid on the wings

Wheel pants and gear fairings laid on the wings

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.