KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  3-19-2013
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Checked Oil Door Doubler after Glassing

The clamps were removed from the doubler glued to the oil door opening.Everything looks very solid.
' style=

The inside of the oil door

The inside of the oil door

' style=

The outside of the door opening

The outside of the door opening

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.