Brief Description: Riveted Receptacles to Braces to Firewall
The camloc receptacles were riveted to the top aft braces with the pneumatic squeezer. The two spacers were also riveted to the right braces. The two braces were then riveted to the firewall flanges. I positioned the top cowling in place and fastened the camlocs on the right side.
The right aft top brace and spacers ready for riveting
The two aft top braces with the camloc receptacles getting riveted in place
The left top brace ready to be riveted to the firewall flanges