KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  6-4-2012
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Added Patches to Canopy Fairing

The center section of the canopy fairing needed to be patched. Various sizes of patches were cut out and then mixed with epoxy. The patches were placed on the top and underside of the fairing.
' style=

The patches cut out

The patches cut out

' style=

The patches and the plastic

The patches and the plastic

' style=

Patches laid over the top of the fairing

Patches laid over the top of the fairing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.