KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  11-9-2010
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Assisted with Installing Canopy Roll Bar/Side Rail

Bernie Ockuly helped me bolt the roll bar and the canopy side rails in place.
' style=

The canopy roll bar bolted and torqued

The canopy roll bar bolted and torqued

' style=

The left side rail installed

The left side rail installed

' style=

Bernie asking

Bernie asking "Why won't this screw go into the nut?" Probably because I gave him too short a screw

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.