KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  11-9-2010
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Repainted Canopy Rail Supports

I taped and covered the interior in preparation of painting the canopy supports. I primed the supports and then spray-painted them with the Rustoleum paint. I bolted the canopy roll bar in place. I had to replace the called-for bolts in the plans with the next longer size. I used SuperGlue to glue the washers to the nuts, trying to make it easier to get the nuts/washers onto the bolts. It took a while, but Bernie and I finally got them on. They were torqued down. The canopy rails were screwed in place with the nutplate strips. The aft two screws were too short, so I need to get longer AN509-8R10 or -8R12 countersunk screws.
' style=

The interior covered so that the side canopy supports could be repainted

The interior covered so that the side canopy supports could be repainted

' style=

The left canopy support painted

The left canopy support painted

' style=

The interior repainted

The interior repainted

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.