KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  9-8-2010
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Prepared Canopy Roller Weldments for Riveting

I measured and marked the positions of the tip-up stops on the canopy roller weldments. Pilot holes were drilled in the stops and the stops were clamped to the weldments. The weldments were drilled and then both were drilled up to #30 size for riveting. Matching 1/4'' bolt holes were drilled in the stops using a Unibit. The outside holes on the stops and the weldments were then countersunk. These will be riveted together with double-flush rivets.
' style=

The tip-up stops ready to be drilled to the weldments

The tip-up stops ready to be drilled to the weldments

' style=

The roller weldments and the stops drilled together

The roller weldments and the stops drilled together

' style=

The canopy roller weldments and the tip-up stops countersunk

The canopy roller weldments and the tip-up stops countersunk

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.