KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  9-5-2013
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Moved Wings to Hangar

I helped load Jeff's trailer with the wings, tool chest, work benches, drill press and grinder table and then moved everything to the hangar.

I put the empennage/fuselage fairing in place to see the entire empennage now that everything has been painted.
' style=

Right side

Right side

' style=

Left side

Left side

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.