KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  9-5-2013
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Moved Wings and Tools to Hangar

Jeff Paden loaded the wings into the enclosed trailer. We put the wings in the cradle and tied them down. The trailer was loaded up with my tool chest, work benches, drill press and grinder table. Everything was taken to the hangar.
' style=

The hangar after the wings were unloaded

The hangar after the wings were unloaded

' style=

The right wing

The right wing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.