KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  12-5-2013
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Wire Labels/Light Wires

The ring terminals were cut off each of the black wires that had been screwed onto the light switches. Each end of wire had heat shrink applied to it.

I labeled the landing light wires. I ran the Wigwag yellow and the blue wires from the left and right wings respectively up along the sidewalks and under the instument sub-panel. The wires were crimped into a connector and then a blue wire was crimped into the other end of the connector. This wire will have a pin added to the other end and put into the P-1-0 connector.

I made labels for the AeroLed light wires. The yellow WigWag wire was labeled.
' style=

Labels

Labels

' style=

The WigWag wire

The WigWag wire

' style=

The WigWag wire after labeling

The WigWag wire after labeling

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.