KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  11-27-2013
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Moved RV to MX Hangar/Fuel Guardian Wires

George Gilby, mechanic at Medina Airport, agreed to let me move the RV into the heated maintenance hangar. I moved everything away from around the airplane and stored all of my tools. Cliff towed the plane to the hangar as I walked with the tail in 20+ kt winds. I then moved many tools, step stools, and electrical equipment from my hangar to the MX hangar.

The Fuel Guardian wires from the fuel tanks were run up along the sides of the fuselage and thru the Dynon hole in the panel. The wire along the right side was laid along the smoke system tubing with spiral wrap. The left-side wire was wrapped along with the AOA blue tubing.

The P-1-0 connection for the wigwag lights was disconnected. The lighting pot will be unscrewed from the rib and removed.
' style=

Spiral-wrapped wires

Spiral-wrapped wires

' style=

The Fuel Guardian wires and controller

The Fuel Guardian wires and controller

' style=

RV sitting in a heated hangar

RV sitting in a heated hangar

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.