KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  11-24-2009
Number of Hours:  0.10
Manual Reference:  
Brief Description:  Photos-Clamp/Flap Switch/Cooling Tubes
' style=

Adel clamp for the AOA wiring

Adel clamp for the AOA wiring

' style=

The new flap switch, missing two screws

The new flap switch, missing two screws

' style=

Routing of the cooling tubes

Routing of the cooling tubes

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.