KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  11-20-2009
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Instrument Shelf w/Nutplates

I positioned and drilled holes in the instrument shelf for the three boxes and two cooling fans. I also drilled and riveted the nutplates to the shelf. I cut and bent two 3 1/2'' long pieces of .032 material and made them into brackets for the AOA CPU. I drilled a hole in the shelf at the center of the ignition box for a cooling tube, but the hole needs to be enlarged.

I need to get some #6 screws to attach the brackets to the AOA CPU.

Visitors: Mary, Drew, Wally
' style=

The instrument shelf before nutplates and holes

The instrument shelf before nutplates and holes

' style=

Nutplates added for the components

Nutplates added for the components

' style=

Underside of the shelf

Underside of the shelf

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.