KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  5-6-2014
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Firewall Forward Adjustments

I worked with Dave Ross during his TC visit. I moved some wires away from other wires and tubes. The starter wire was rerouted. Some wires had been tied together with lacing string. The string was cut off. The wires will be clamped.
' style=

Right side of the engine

Right side of the engine

' style=

Aft left side of the engine

Aft left side of the engine

' style=

Aft right side of the engine

Aft right side of the engine

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.