Powered By Kitlog Pro v2.0
Baker's RV-6
RV-6
Firewall Forward
5-6-2014
< Previous Log Entry
Next Log Entry >
Date:
5-6-2014
Number of Hours:
6.50
Manual Reference:
Brief Description:
Firewall Forward Adjustments
I worked with Dave Ross during his TC visit. I moved some wires away from other wires and tubes. The starter wire was rerouted. Some wires had been tied together with lacing string. The string was cut off. The wires will be clamped.
Right side of the engine
Aft left side of the engine
Aft right side of the engine
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-6 Home
Category
# Logs
# Hours
All
3121
5540
Avionics
4
6
Canopy
334
544
Control Systems
8
12
Cowling
164
199
Empennage
326
666
Engine
84
124
Finish Kit
9
17
Firewall Forward
353
570
Flight Training
1
7
Fuselage
643
1225
Inspection
1
0
Instrument Panel
142
227
Interior
4
8
Landing Gear
28
46
Miscellaneous
22
13
Painting
113
256
Prop
3
4
Shop Construction
50
24
Systems
11
35
Tools
1
0
Weighing
8
7
Wings
686
1334
Wiring
126
216
Copyright © 2001-2024 Matronics. All Rights Reserved.