KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  1-7-2012
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Deck Drilled to Carb Heat Box

#40 pilot holes were drilled in the carb heat box for attaching the deck with sheet metal screws. The deck was positioned on the box and the pilot holes were extended to the deck. The holes on the deck were enlarged for the sheet metal screws. The carb heat inlet was positioned on the deck and its position was marked in place.
' style=

The deck drilled to the carb heat box

The deck drilled to the carb heat box

' style=

The deck with the holes enlarged

The deck with the holes enlarged

' style=

The inlet positioned on the deck

The inlet positioned on the deck

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.