KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  2-4-2014
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Right Nav/Strobe Lights/Right Landing Light

Two dehydrator plugs were dried out by emptying the plugs and putting the beads next to the propane heaters.

The right landing light was inserted into the wing. The ground wire was screwed onto the lower inboard screw and washer. The light was initially screwed in place using the top aft holes. The light was turned on and I found it was aimed high. The top screws were unscrewed and the light was tipped forward. The light was screwed into place in the forward position.

The right wing tip was removed and laid on top of the wing. The green nav light was taken apart. The nav power light was crimped into the connector. The strobe power wire was plugged into the strobe light. The nav/strobe light assembly was screwed onto the wingtip.
' style=

The right nav/strobe light

The right nav/strobe light

' style=

The right landing light screwed in place

The right landing light screwed in place

' style=

The nav and strobe wires

The nav and strobe wires

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.