KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  9-23-2013
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Replaced Torque Tube Bearings/Emp Fairings

I replaced the rod-end bearings in the aileron torque tubes with new ones. The old bearings were very difficult to operate and resisted rotation.

I screwed in the empennage/fuselage fairings under the horizontal stabilizer with #6 screws and Tinnerman washers.
' style=

The fairing screwed to the fuselage under the horizontal stabilizer

The fairing screwed to the fuselage under the horizontal stabilizer

' style=

The empennage

The empennage

' style=

The right side of the fuselage with the fairing screwed in place

The right side of the fuselage with the fairing screwed in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.