KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  7-20-2013
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Installed Left Fuel Tank

The landing light wires were run thru a loom for the length that rests behind the fuel tank. Heat shrink was placed on both ends of the loom. The left fuel tank was placed on the wing and the wires and AOA tubing were run behind it. More heat shrink was applied to the Fuel Guardian wire. The fuel tank was screwed to the fuselage.
' style=

The wires in a loom behind the fuel tank

The wires in a loom behind the fuel tank

' style=

Heat shrink on the Fuel Guardian wire

Heat shrink on the Fuel Guardian wire

' style=

The left fuel tank screwed on the wing

The left fuel tank screwed on the wing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.