The landing light wires were run thru a loom for the length that rests behind the fuel tank. Heat shrink was placed on both ends of the loom. The left fuel tank was placed on the wing and the wires and AOA tubing were run behind it. More heat shrink was applied to the Fuel Guardian wire. The fuel tank was screwed to the fuselage.