KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  7-4-2013
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Pitot Heat Controller and Wiring

The wiring for the pitot heat controller was run thru the plastic tubing. Holes were drilled in the two aft ribs next to the fuel tank for the pitot and static tubing. Plastic grommets were snapped into the holes.
' style=

The nutplate on the access panel side

The nutplate on the access panel side

' style=

Pitot heat wiring and grommets in the holes for the tubing

Pitot heat wiring and grommets in the holes for the tubing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.