KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  3-7-2012
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Drilled Center of Right Spar for Wiring

The center of the right main spar was drilled for the wires that will be run thru the area. A plastic bushing with an ID of 1/2", OD of 5/8" was used to check the cutout. The center of the left spar was also checked and the cutout was enlarged slightly.

The center fuselage was drilled for a second hole, 5/8" diameter. The snap bushings were installed in the center fuselage in both holes. Wires were run thru the bushings.
' style=

The cutout in the right spar

The cutout in the right spar

' style=

The center fuselage with wires run thru

The center fuselage with wires run thru

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.