KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  10-31-2003
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Drilled Left Top Skin to Skeleton/Stub Rib

Drilled top inboard skin & doubler to remainder of main spar, ribs, & rear spar w/41 bit. Enlarged holes in doubler & ribs 2-4 w/30 bit.
Positioned W-427 rib into position against ribs 9 & 10 & skin. Bent flange into position. Drilled out 2 rivets in rib 9 & bellcrank bracket. Drilled pilot holes in both 427 ribs. Clamped 427 rib into position & drilled rib to skin, then to ribs.
Clamped & drilled top outboard skin to main spar for inboard 20 holes.
Deburred inside of bottom inboard skin.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.