KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  6-29-1996
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Horizontal Stabilizer

Located centerline of left side of forward spar and located end of forward spar. Drilled holes thru tips of left side of forward spar and left tip rib. Aligned all ribs and spar and then drilled all holes in left HS thru skin, ribs, and spar with 3/32" bit.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.