KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  2-1-2012
Number of Hours:  1.00
Manual Reference:  
Brief Description:  VS on Fuse/Wrapped up Elevators, Rudder

The vertical stab was put back on the fuselage with the horizontal stab. The painted pieces were marked with blue tape to mark areas that need further attention. The elevators and the rudder were wrapped in paper and placed up on the shelves.
' style=

The HS and VS on the fuselage

The HS and VS on the fuselage

' style=

The left end of the HS that was filled with microballoons

The left end of the HS that was filled with microballoons

' style=

The right end cap of the HS

The right end cap of the HS

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.