KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  11-22-2011
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Fiberglass Cloth in Place on the Fairing

After adding one strip on each side, the fairing was placed into position. I attempted to get the cloth to attach to the fairing, but I'm not sure if it did on either side. The fairing was clecoed in place and the other four strips were epoxied and then laid in position two bids on each side. I drilled thru the lower front corner on each side and clecoed it to the fuselage, to keep the fairing down against the fuselage. The leading edge bends were cut in the cloth so that the top and bottom would lay over each other. The fuselage side of the cloth was cut in four lines spraying out from the leading edge juncture. These trim cuts allowed the cloth to lay more naturally around the leading edge.
' style=

The underside of the left side

The underside of the left side

' style=

The right side with the new cleco

The right side with the new cleco

' style=

The right underside

The right underside

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.