KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  10-24-2011
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Some Fairings Drilled to the HS, VS and Control Su

The holes to attach the fairings to the left HS and the left elevator were laid out and drilled to #30. The fairings were drilled in place. I didn't realize it until after drilling the elevator fairing on the top side, that the fairing stuck out farther than the HS fairing. The fairing will need to be adjusted. The top rudder and VS fairings were drilled in place. The right HS and elevator were marked in preparation of drilling pilot holes.
' style=

The VS and rudder fairings

The VS and rudder fairings

' style=

The left side fairings that don't line up

The left side fairings that don't line up

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.