Baker's RV-6
' style=
Date:  12-30-2008
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Finished down angles of elevators

I took a little more material off the F-611E spacer and got another degree of down movement of the elevators. The down angle is now at 23°. I then took the elevator and the HS off the fuselage.
' style=

Elevator control horns in place

Elevator control horns in place

' style=

Cut-outs of HS rear spar for the down angle of the elevators

Cut-outs of HS rear spar for the down angle of the elevators

' style=

Close-up of left elevator horn and cutouts of HS rear spar and spacer

Close-up of left elevator horn and cutouts of HS rear spar and spacer

' style=