Brief Description: Riveted Bracket to Subpanel/Smoke Tubing
The bracket which was made the day before was riveted to the subpanel. The throttle was clamped to the bracket. The wires going into the P4S connector were also clamped to the bracket.
The tubing for the smoke system was clamped to the reservoir and run forward.
The new bracket riveted in place with the P4S wires