KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  3-11-2012
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Riveted Bracket to Subpanel/Smoke Tubing

The bracket which was made the day before was riveted to the subpanel. The throttle was clamped to the bracket. The wires going into the P4S connector were also clamped to the bracket.

The tubing for the smoke system was clamped to the reservoir and run forward.
' style=

The new bracket riveted in place with the P4S wires

The new bracket riveted in place with the P4S wires

' style=

The bracket in place with the throttle cable

The bracket in place with the throttle cable

' style=

The smoke system tubing

The smoke system tubing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.