KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  3-6-2012
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Ground Wires Screwed Together

The ring terminals were tied together with a #6 screw. The lead wire was then run thru the P4S connector, but the wire was too short. Another wire was made up, longer this time, and reattached.
' style=

The ground wires screwed together

The ground wires screwed together

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.