KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  1-9-2012
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Riveted Control Arm to Ram Air Door

The control arm was drilled and riveted to the ram air door with AN4-4 rivets. The arm was checked for clearance with the deck and the inlet.
' style=

The ram air door and arm

The ram air door and arm

' style=

The underside of the ram air door

The underside of the ram air door

' style=

The carb heat deck

The carb heat deck

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.