Powered By Kitlog Pro v2.0
Baker's RV-6
RV-6
All
10-4-2011
< Previous Log Entry
Next Log Entry >
Date:
10-4-2011
Number of Hours:
1.00
Manual Reference:
Brief Description:
HeatShrink Terminals/Wiring
The terminals for the EGT and CHT wires were connected to the probe wires and heatshrink was applied over each terminal connection.
The wires on the left side were tie-wrapped along the manifold pressure hose.
The EGT and CHT wires with new terminals
Heatshrink applied over the terminals
The left side with more wires tied up
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-6 Home
Category
# Logs
# Hours
All
3121
5540
Avionics
4
6
Canopy
334
544
Control Systems
8
12
Cowling
164
199
Empennage
326
666
Engine
84
124
Finish Kit
9
17
Firewall Forward
353
570
Flight Training
1
7
Fuselage
643
1225
Inspection
1
0
Instrument Panel
142
227
Interior
4
8
Landing Gear
28
46
Miscellaneous
22
13
Painting
113
256
Prop
3
4
Shop Construction
50
24
Systems
11
35
Tools
1
0
Weighing
8
7
Wings
686
1334
Wiring
126
216
Copyright © 2001-2024 Matronics. All Rights Reserved.