KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  9-24-2011
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Replaced P1 Wire/Attached It to ALT CB

The P1 wire was replaced in its original position, screwed to the Master Relay and run thru the hole in the firewall. A terminal nipple was placed over it and the Master Relay bolt and nut. The wire was run up the tubing inside the firewall and then under the right instrument rib. A hole in the instrument subpanel was drilled and one bushing was fit inside of a larger bushing and then into the subpanel. The wire end then had a terminal crimped onto it using the Swedge-On Tool, with heat-shrink applied. The terminal was screwed onto the Bat side of the Alternator CB. The two holes in the subpanel were labeled ALT and BAT for the wires coming thru.
' style=

The ALT and BAT wires from the firewall to the alternator CB

The ALT and BAT wires from the firewall to the alternator CB

' style=

The Alt CB with the power wires attached

The Alt CB with the power wires attached

' style=

The instrument subpanel holes marked

The instrument subpanel holes marked

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.