The left firewall pass-through was finished with lining up all of the holes and it was assembled in place temporarily. Holes were drilled in the firewall for the ammeter shunt on the right side. I need to get the proper length of bolts for attaching the ammeter shunt. Temporary bolts and washers were used to attach the shunt to the firewall.