KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  4-23-2011
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Assisted Gary with Throttle and Carb Heat Cables

John McCreight assisted me with riveting the cowl inlet ramps, drilling the firewall for the throttle steel passthrough and installing the throttle and carb heat cables.
' style=

Close-up of the throttle, carb heat and mixture cables coming thru the firewall

Close-up of the throttle, carb heat and mixture cables coming thru the firewall

' style=

The control cables on the instrument panel bracket

The control cables on the instrument panel bracket

' style=

The cables going thru the center cover

The cables going thru the center cover

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.