KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  3-9-2009
Number of Hours:  2.00
Manual Reference:  
Brief Description:  TruTrak SB Compliance/Rudder Pedal Bracket

I drilled out rivets in left pedal bracket. Countersunk rivet holes in new bracket. Riveted new bracket to pedal. Drilled bolt hole in new bracket and positioned pedal in place. Clamped the top of the two pedals to each other with the ruler for alignment. Marked the location on the bracket for the master cylinder bolt hole and drilled the hole. Primed the hole areas in the F-6111B bracket.
I received two screws from TruTrak to be used in the servos. TruTrak came out with a Service Bulletin stating that a screw on each servo needs to be replaced to ensure that the servo control arm does not become disconnected.
' style=

The F-6111B bracket primed

The F-6111B bracket primed

' style=

The right rudder pedal replaced

The right rudder pedal replaced

' style=

The TruTrak Service Bulletin for replacing screws

The TruTrak Service Bulletin for replacing screws

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.