KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  2-17-2010
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Strobe Power Supply/EDC-10A Wiring/Smoke Sys Tubin

Steve showed me how to solder pins to the strobe wires and he made the left and right connections to the power supply. He finished making the grounds for the strobe wires. The grounds had ring terminals attached, which were placed on the bolts. He used his heat gun on the heat-shrink tubing over the OAT/EDC wires going into the remote magnetometer. He made the backshell for the connection into the remote magnetometer.

Steve suggested that the smoke system reservoir should be fastened with 1/4'' screws, rather than the #8 screws currently in there. We talked about the smoke system tubing routing. Steve liked Jeff's idea of adding a U-channel to the side bulkhead and also adding a matching channel to the left side.
' style=

Steve soldering connectors to the strobe wires

Steve soldering connectors to the strobe wires

' style=

More soldering

More soldering

' style=

The power supply with all wires and ground connected

The power supply with all wires and ground connected

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.