Dave cut out the lightening holes in the battery box, using a 2" hole cutter on the drill press. Holes were cleaned up with the die grinder. Dave assisted Gary with the positioning and drilling of the box to the brackets and the riveting. Dave made up the relay doubler and drilled the holes in it.