KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  8-28-2009
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Battery Box Lightening Holes/Positioning

Dave cut out the lightening holes in the battery box, using a 2" hole cutter on the drill press. Holes were cleaned up with the die grinder. Dave assisted Gary with the positioning and drilling of the box to the brackets and the riveting. Dave made up the relay doubler and drilled the holes in it.
' style=

Battery box and firewall recess in position

Battery box and firewall recess in position

' style=

Relay doubler

Relay doubler

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.