KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  12-11-2008
Number of Hours:  0.10
Manual Reference:  
Brief Description:  Photos-Drilled HS to Longeron
' style=

Aft Deck Ready to be Riveted in place

Aft Deck Ready to be Riveted in place

' style=

Aft Top Deck

Aft Top Deck

' style=

Left side of HS forward spar drilled

Left side of HS forward spar drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.