Powered By Kitlog Pro v2.0
Baker's RV-6
RV-6
All
12-8-2008
< Previous Log Entry
Next Log Entry >
Date:
12-8-2008
Number of Hours:
5.00
Manual Reference:
Brief Description:
Cut Elevator Control Rod/Wood Legs
Measured and cut F-690 control rod to proper length. Made wood legs for stabilizing the fuselage. These were screwed to the wood false spar.
Found that two holes for the trim cable need to be drilled in bulkheads F-604 and F-605.
Ordered 6061-T6 1''x1'' and 1 1/2''x1 1/2'' angle, fitting cap, and many cushioned clamps from Wick's.
Bernie Ockuly stopped by and dropped off all of his scrap material from his -7A, as well as a 4' stick of 1x1x1/8'' 6061-T6 angle.
Wood legs attached the false spar
Fuselage leveled to zero degrees along the longeron
Roll axis of fuselage leveled to zero degrees
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-6 Home
Category
# Logs
# Hours
All
3121
5540
Avionics
4
6
Canopy
334
544
Control Systems
8
12
Cowling
164
199
Empennage
326
666
Engine
84
124
Finish Kit
9
17
Firewall Forward
353
570
Flight Training
1
7
Fuselage
643
1225
Inspection
1
0
Instrument Panel
142
227
Interior
4
8
Landing Gear
28
46
Miscellaneous
22
13
Painting
113
256
Prop
3
4
Shop Construction
50
24
Systems
11
35
Tools
1
0
Weighing
8
7
Wings
686
1334
Wiring
126
216
Copyright © 2001-2024 Matronics. All Rights Reserved.